In over 38 years, Makati Development Corporation MDC has built a solid reputation for market excellence. It is a premiere Filipino EPC/CM Company that transformed Makati into a world class financial and commercial District and changed the Philippine Landscape at par with the world’s best.
As Ayala Land’s construction arm. MDC plays a vital role in serving 100% of Ayala land projects.
The Project
MDC is not a new company to me even
before the construction of Ayala Centrio Mall in Cagayan De Oro City so as soon
as I was informed that MDC will be the first company that we will be visiting
in Cebu City I was already expecting a blast experience out there based upon on
the reputation of the company. I couldn’t even think of a good civil engineer
who doesn’t know or even heard of this company.
As
expected, I was extremely amazed, challenged and inspired after our visit in
the site where they were currently constructing a high rise condominium that
rises above Ayala Center Cebu. The building is called the Park Point Residences
wherein it is programmed to merge the twin destination of Cebu City, the Cebu
Business Park and the Cebu IT Park.
The
Structural, Architectural and the Actual Operation
According to the engineer who toured
us in the site, the construction of the building is in a 24/7 operation. They started board piling which consists of
more than 15m since there is basement. They used pre cast exterior walls from
Manduae City. The Slabs were pre-fabricated. In 14 days curing time it is already okay
and of course the installment is at the site.
For
their connections, they used pre fixed and post fixed with the help of tower
cranes. The columns curing days is 7 while the beam and girders is 14 and if the walls and columns need admixtures, they added it
but then again the curing days that will reach its maximum strength is 28 days. Normally, according to the engineer, it has about 7,
000 psi.
On the
other hand, the interior walls they used will mainly depend on the strength and
specification. One more thing I was able to confirm by asking the engineer is
that the first thing in a project will always be based on the Structural Plan
and not on the Architectural plan. However, architectural work needs more time
and it is more delicate than the structural works.
The Floor
Plans
The
condominium includes a 1 bedroom to 3 bedroom residences with limited edition
residences such as the Mountain Scape, City Scape, Sky Scape Residences A to C
and lastly an aqua scape residences with 3 bedroom B1 Level Penthouse unit with
pool. The building also features a park point deck where the swimming pool,
kiddie pool and Gazebo are located, park point podium and more…
Here is the Photo of the Architectural
Plan and Safety Precaution of the Project
Personal
Experiences, Insights and Thoughts
Here I
was able to learn so many things that I couldn’t even easily learn by just
reading my textbooks. Also, I was able to take a closer look of my “future”
field. I didn’t even hesitate to ask questions because I want to grab the
opportunity to learn and I am really so blessed that they answered me in the
simplest manner in order for me to understand it even if I still don’t have
real experiences in the actual construction project.
As I
have observed in the site, they are actually considering four major dimensions
in the development of the project. These include, Safety, quality, time and sustainable
construction.
a.
Safety
One
thing that caught my attention before going up to the building is the way they
observed the safety of every worker and visitors just like us. They have this
safety notice board which shows their project monthly statistics and I
seriously praise those construction firms like MDC who are really concern not
only to the development of the project but as well as the good of all workers.
As their safety slogan says, “It is better to be careful a thousand times than
killed once”.
b.
Time
Aside
from the safety, MDC also provide a timely statistics of the development of the
project. I think it is very essential to meet every deadline as according to
the plan and with these records they will be able to trace their tracks and be
aware of the time they have lost. This statistics updated every month, in the
aspect of the total man hours worked, total number of manpower, total number of
non-cost time accident and more…
c.
Quality
“Quality
natin Pangako Natin!”
Yes,
every construction firm always claim that the quality of service they are
providing is at maximum, that they did their best to produce the best quality
of the project but MDC is purely different from others, they distinctly have
standards for every little details they are constructing. This is the most
probably reason why MDC is the construction arm of all Ayala Projects.
d.
Sustainable Construction
I have
also observed that based on the quality of projects produced by MDC, they were able to create
a sustainable construction. Sustainable in a way that there construction
involves methods that do not completely use up or destroy natural resources and
their projects were able to last or continue for a longer time.
To sum up,
visiting MDC is one of the best construction site I have visited so far. It was
all worth it experienced that I will always treasure in my whole life.
This visit is part of our Plant Tour 2014. Xavier University Civil Engineering students taking up CE43: Construction Materials and Testing. Cebu City Plant Tour Journal
Facebook: https://www.facebook.com/marklowillalmedaa
Facebook: https://www.facebook.com/marklowillalmedaa
No comments:
Post a Comment